Leak-damaged ceiling replacement
We remove wet or stained boards, repair the frame behind them and fit new boards. The new section is finished and painted to match the rest of the ceiling.
Ask about this →Home / Services / Ceiling & Drywall Works
Ceiling and drywall contractor in SingaporeFalse ceilings, leak-damaged ceiling replacement, drywall partitions and access panels for homes, offices and shops across the whole of Singapore, finished smooth and ready to paint.


A ceiling usually comes to our attention for one of two reasons. Either a leak has left it stained, soft or sagging, or the owner wants something new: a false ceiling with cove lights, a lowered ceiling to hide pipes, or an extra room made with a drywall partition. Both jobs need the same care with framing and finishing.
For damaged ceilings, we first make sure the leak above is fixed, whether it comes from the roof, a bathroom upstairs or an aircon pipe. New boards under an active leak only waste money, because the stain returns. In Singapore's humidity, trapped moisture can also lead to mould, so we check the space properly before closing it up.
We then remove the wet boards, replace the frame where it has rusted or rotted, and fit new gypsum or calcium silicate boards. In kitchens and bathrooms we use moisture-resistant boards that cope better with steam. Joints are taped, skimmed and sanded so they disappear under paint.
For new work we build galvanised steel frames for flat, stepped and L-box ceilings, with access panels for aircon, water tanks and wiring. False ceilings neatly hide pipes and trunking in HDB flats and condos and make room for downlights or cove lighting. Drywall partitions split a room, close a staircase or create a store or study without the weight and mess of brickwork, and rock wool can be added for sound insulation.
Because our team also handles electrical work and painting, the lights, switches and final coat can be done in the same job.
Six jobs cover most of the ceilings and partitions we build and repair.
We remove wet or stained boards, repair the frame behind them and fit new boards. The new section is finished and painted to match the rest of the ceiling.
Ask about this →Flat, stepped and cove-light ceilings that hide pipes, trunking and wiring. L-boxes are a tidy way to cover aircon pipes along a wall.
Ask about this →New rooms, stores and staircase enclosures on galvanised steel studs. Lighter and quicker to build than brick walls.
Ask about this →Neat, framed openings for aircon, water tanks and wiring, so future servicing does not mean damaging the ceiling.
Ask about this →Rusted steel or rotted timber frames replaced, so the new ceiling stays straight and safe.
Ask about this →Cracks and holes filled, a skim coat applied and sanded smooth, then painted so the ceiling looks new again.
Ask about this →Catching any of these early usually means a smaller repair.
A stain or soft spot means water above. The leak has to be fixed before the board is replaced. Common sources are the roof, a bathroom upstairs or a dripping aircon pipe.
Boards that dip are heavy with water or no longer held by the frame. Do not wait for them to fall. Keep people away from the area and arrange an inspection soon.
Lines between boards mean the joint tape has failed or the frame has moved. Small cracks can be re-taped and skimmed. Wider or growing cracks may point to a frame problem.
Black spots and a damp smell mean moisture is trapped above the ceiling. It is common in Singapore bathrooms and kitchens. The moisture source needs to be found, not just painted over.
Changing lights or reaching aircon pipes is hard without a proper access panel, and technicians may end up cutting holes. A framed panel solves this for good.
A drywall partition creates a new room, store or study without heavy brickwork. It is quicker to build and makes less mess.
Send us a photo on WhatsApp. We will tell you what we see and arrange an inspection.
We make sure the water above is stopped before a new ceiling goes up, so the stain does not come back. If the leak needs roof or plumbing work, we handle that too.
Joints are taped, skimmed and sanded, and frames set level, so the ceiling stays flat and looks clean even under strong downlights.
Moisture-resistant boards for kitchens and bathrooms, standard gypsum for living areas, and calcium silicate where extra durability is needed.
Furniture and floors are covered, dust is kept down and the area is cleaned each day. It matters when you are living in the home during the job.
We check the room, the existing frame and any leak above, and take measurements so the quote is accurate.
We agree board type, ceiling height and lighting points with you, and send a written quote before work starts.
Furniture and floors are covered, the frame is built and boards are fixed. Wiring for lights can be run at this stage.
Joints are taped, skimmed and sanded, then painted. We clean up before handing the area back.
Most ceiling damage starts with a small leak above. A slow drip can soak a board for weeks before a stain shows. Acting early keeps the repair small.
Steam causes mould on bathroom ceilings. Run the exhaust fan or open the window after showers, especially in Singapore's humid weather.
It makes future aircon and wiring work much easier, and it is simplest to add while the ceiling is being built.
Standard boards can soften and sag under steam. The extra cost is small compared with replacing a ceiling later.
Yes, if the frame is sound. We cut out the damaged section, fit a new board and blend the joint so it disappears after painting. If the frame above has rusted or rotted, we repair that first. We check this during the site visit and explain what is needed.
A typical partition for one room takes one to two days, plus a day for painting. Larger layouts, or partitions with doors and electrical points, take longer. We give you a clear timeline in the quote and keep the area tidy each day.
Yes, if we know beforehand. We add timber or steel backing inside the wall at the right height so screws have something solid to hold. Tell us where you plan to mount items during the design stage.
Yes. Our electrical team runs the wiring and fits the lights while the ceiling is open, which avoids cutting into finished boards later. We agree the lighting points with you before we start.
Some partition works in HDB flats need a permit. We tell you during the site visit if your job does. Condo owners may also need approval from their management before renovation starts, so it is best to check early.
Send us photos on WhatsApp. Our team will look and reply with honest advice, any time, anywhere in Singapore.
Chat With Our Team→